Electrical chain hoist PS-GPFU
Electrical chain hoist, electric carriage or complete crane system can be equipped with inverter (frequency converter)so we get a smooth start and stop. This ensures accurate positioning of the load and minimizes its swing. The lifting and driving speeds can be programmed according to the needs.
Labour intensity group (according to the FEM classification):
1Bm (M3) = 150 switches per hour / 25% / 400 man-hours 1Am (M4) = 180 switches per hour / 30% / 800 man-hours 2m (M5) = 240 switches per hour / 40% / 1600 man-hours 3m (M6) = 300 switches per hour / 50% / 3200 man-hours 4m (M7) = 360 switches per hour / 60% / 6400 man-hours
Capable of using the inverter:
- for hoists with lifting capacity up to 2500kg
- as equipment for hoists and bogies at high frequency switching and changing mode
- permitted at lifting speeds up to 14 m/min
- option: connection to radio control
| Model | Electrical supply | FEM Working Group: 3m (M6) – load capacity [kg] | FEM Working Group: 4m (M7) – load capacity [kg] | Lifting speed (at 50Hz) [m/min] | Chain |
|---|---|---|---|---|---|
| PS-GP 250/1NL.FU | 3-phase | 320 | 250/ 200/ 160/ 125/ 100 | 1.2/6.9 | single |
| PS-GP 250/1N.FU | 3-phase | 320 | 250/ 200/ 160/ 125/ 100 | 2.4/13.9 | single |
| PS-GP 250/2NL.FU | 3-phase | 630 | 500/ 400/ 320/ 250/ 200 | 0.6/3.5 | double |
| PS-GP 500/1NL.FU | 3-phase | 630 | 500/ 400/ 320/ 250/ 200 | 1.2/6.9 | single |
| PS-GP 500/1N.FU | 3-phase | 630 | 500/ 400/ 320/ 250/ 200 | 2.4/13.9 | single |
| PS-GP 500/2NL.FU | 3-phase | 1250 | 1000/ 800/ 630/ 500/ 400 | 0.6/3.5 | double |
| PS-GP 500/2N.FU | 3-phase | 1250 | 1000/ 800/ 630/ 500/ 400 | 1.2/6.9 | double |


